OPTIMALISASI PROSES BISNIS MELALUI IMPLEMENTASI PRINSIP LEAN PADA DIREKTORAT RISET DAN PENGABDIAN KEPADA MASYARAKAT UNIVERSITAS BRAWIJAYA (DRPM UB)
DOI:
https://doi.org/10.21776/ub.jrsmi.2026.03.11.02Keywords:
BPMN, Efisiensi Proses Bisnis, Kanban, Prinsip Lean, Simulasi, VSMAbstract
Direktorat Riset dan Pengabdian kepada Masyarakat Universitas Brawijaya (DRPM UB) berperan penting dalam mendukung Tri Dharma Perguruan Tinggi. Namun, proses bisnisnya menghadapi kendala berupa ketidaksesuaian lead time dengan SOP akibat pemborosan waktu tunggu (waiting time) dan kurangnya efisiensi sistem. Optimalisasi dilakukan dengan memetakan alur bisnis aktual menggunakan Business Process Model and Notation (BPMN) dan mengidentifikasi aktivitas non value-added melalui Value Stream Mapping (VSM). Analisis akar masalah dilakukan menggunakan fishbone diagram dan pareto chart. Solusi berbasis metode Kanban dengan platform Jira diusulkan untuk meningkatkan transparansi, mengurangi bottleneck, dan mempercepat waktu respons antar stakeholder. Simulasi menggunakan software Arena menunjukkan pengurangan aktivitas non value-added sebesar 97,15%, menghasilkan alur kerja yang lebih efisien dan responsif. Pendekatan ini memperbaiki kualitas layanan dan memastikan janji layanan DRPM UB terpenuhi sesuai SOP, mendukung pengelolaan riset dan pengabdian masyarakat secara lebih efektif.
References
[1] A. Batwara, V. Sharma, M. Makkar, and A. Giallanza, “Towards smart sustainable development through value stream mapping – a systematic literature review,” Heliyon, vol. 9, no. 5, Art. no. e15852, 2023, doi: 10.1016/j.heliyon.2023.e15852.
[2] R. M. Belokar, V. Kumar, and S. S. Kharb, “An application of value stream mapping in automotive industry: A case study,” vol. 1, no. 2, 2012.
[3] L. Delicado, J. Sànchez-Ferreres, J. Carmona, and L. Padró, “The model judge: A tool for supporting novices in learning process modeling,” n.d.
[4] C. Deliou and M. Malagkoniari, “The use of cause and effect diagram (fishbone) and its impact on personal quality management: Case study in a classroom during the pandemic of COVID-19,” in Proc. International Conference on Business and Economics—Hellenic Open University, vol. 1, no. 1, 2023, doi: 10.12681/icbe-hou.5298.
[5] N. Ö. Doğan and O. Unutulmaz, “Lean production in healthcare: A simulation-based value stream mapping in the physical therapy and rehabilitation department of a public hospital,” Total Quality Management & Business Excellence, vol. 27, nos. 1–2, pp. 64–80, 2016, doi: 10.1080/14783363.2014.945312.
[6] A. D. Ellina et al., “Penerapan lean healthcare dalam pengelolaan manajemen keperawatan di rawat inap Dhaha RSUD Gambiran Kota Kediri,” Community Development in Health Journal, vol. 1, no. 2, p. 82, 2023, doi: 10.37036/cdhj.v1i2.439.
[7] L. Griffiths and A. Tyson, “Visualising success: The Kanban approach to improving collaboration and communication in the library,” Legal Information Management, vol. 23, no. 4, pp. 245–250, 2023, doi: 10.1017/S1472669623000580.
[8] P. Gunaki, “Value stream mapping—tool to optimize the process,” Journal of Mines, Metals and Fuels, pp. 164–168, 2023, doi: 10.18311/jmmf/2022/31221.
[9] K. Kundu, M. Rossini, and A. Portioli-Staudacher, “A study of a Kanban-based assembly line feeding system through integration of simulation and particle swarm optimization,” International Journal of Industrial Engineering Computations, pp. 421–442, 2019, doi: 10.5267/j.ijiec.2018.12.001.
[10] M. Malinova, “A language for process map design,” in Business Process Management Workshops, F. Fournier and J. Mendling, Eds. Cham, Switzerland: Springer International Publishing, 2015, vol. 202, pp. 567–572, doi: 10.1007/978-3-319-15895-2_49.
[11] B. Neyestani, “Seven basic tools of quality control: The appropriate quality techniques for solving quality problems in the organizations,” Zenodo, 2017, doi: 10.5281/ZENODO.400832.
[12] A. Padhil and N. Rauf, “Perancangan instruksi kerja dokumen dan visual pada mesin Electrical Discharge Machine,” Journal of Industrial Engineering Management, vol. 5, no. 2, pp. 80–89, 2020, doi: 10.33536/jiem.v5i2.121.
[13] R. K. Saito et al., “VVV DR1: The first data release of the Milky Way bulge and southern plane from the near-infrared ESO public survey VISTA variables in the Vía Láctea,” Astronomy & Astrophysics, vol. 537, Art. no. A107, 2012, doi: 10.1051/0004-6361/201118407.
[14] A. Trubetskaya, O. McDermott, P. Durand, and D. J. Powell, “Improving value chain data lifecycle management utilising design for Lean Six Sigma methods,” The TQM Journal, vol. 36, no. 9, pp. 136–154, 2024, doi: 10.1108/TQM-01-2024-0020.
[15] W. Ulhassan, U. Von Thiele Schwarz, J. Thor, and H. Westerlund, “Interactions between lean management and the psychosocial work environment in a hospital setting—a multi-method study,” BMC Health Services Research, vol. 14, no. 1, Art. no. 480, 2014, doi: 10.1186/1472-6963-14-480.
[16] F. Yang, B. Ankenman, and B. L. Nelson, “Efficient generation of cycle time-throughput curves through simulation and metamodeling,” Naval Research Logistics (NRL), vol. 54, no. 1, pp. 78–93, 2007, doi: 10.1002/nav.20188.
[17] Y. Zhao and D. Simchi-Levi, “Performance analysis and evaluation of assemble-to-order systems with stochastic sequential lead times,” Operations Research, vol. 54, no. 4, pp. 706–724, 2006, doi: 10.1287/opre.1060.0302.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Benedith Samantha Halim, Widha Kusumaningdyah

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.


