PENERAPAN LEAN MANUFACTURING UNTUK MEMINIMALKAN WASTE PADA PROSES OVERHAUL TURBIN UTAMA DI PLTU PAITON UNIT 2
DOI:
https://doi.org/10.21776/ub.jrsmi.2026.03.06.08Keywords:
Lean Manufacturing, Overhaul, RCA, Turbin Utama, VSM, WasteAbstract
Penelitian ini dilakukan pada proses overhaul area turbin utama pada PLTU Paiton unit 2 dengan skala overhaul Serious inspection yang dilaksanakan selama 42 hari. Penelitian ini bertujuan untuk meminimalkan waste (pemborosan) dalam proses overhaul area turbin utama PLTU Paiton unit 2. Analisis dilakukan dengan menggunakan Value Stream Mapping (VSM) dan Root Cause Analysis (RCA) untuk mengidentifikasi jenis dan akar penyebab waste. Hasil analisis menunjukkan bahwa terdapat 3 waste utama yaitu waste transportation, waiting, dan innapropriate process. Rekomendasi perbaikan yang diajukan meliputi penggunaan alat bantu, pembuatan trolley diapragma, penerapan 5S, dan relayouting. Hasil implementasi rekomendasi menunjukkan pengurangan waste yang signifikan dengan nilai cycle time yang lebih pendek, lead time yang lebih cepat, dan value added ratio yang lebih tinggi.
References
[1] Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, Capaian Kinerja Sektor ESDM Tahun 2022 & Target Tahun 2023. Jakarta, Indonesia: Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, 2023.
[2] S. O. Duffuaa and B. Daya, "Turnaround maintenance in petrochemical industry: Practices and suggested improvement," J. Qual. Maint. Eng., vol. 10, no. 3, pp. 184-190, 2004.
[3] V. Gaspersz and A. Fontana, Lean Six Sigma for Manufacturing and Service Industries. Bogor, Indonesia: Vinchristo Publication, 2011.
[4] J. Leavitt, Lean Maintenance, 1st ed. New York, NY, USA: Industrial Press, 2008.
[5] S. Mostafa, J. Dumrak, and H. Soltan, "Lean maintenance roadmap," in Proc. 2nd Int. Materials, Industrial, and Manufacturing Engineering Conf. (MIMEC 2015), Procedia Manuf., vol. 2, 2015, pp. 434-444.
[6] J. P. Womack and D. T. Jones, Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York, NY, USA: Simon & Schuster, 1996.
[7] M. A. Nash and S. R. Poling, Mapping the Total Value Stream. New York, NY, USA: CRC Press, 2008.
[8] D. L. Taylor and D. Brunt, Manufacturing Operations and Supply Chain Management: The LEAN Approach, 1st ed. Beijing, China: Cengage Learning EMEA, 2001.
[9] W. R. Corcoran, "Defining and analyzing precursors," in Accident Precursor Analysis and Management: Reducing Technological Risk Through Diligence. Washington, DC, USA: National Academies Press, 2004, pp. 79-88.
[10] M. Doggett, "Root cause analysis: A framework for tool selection," Jurnal Ilmiah FEB UB, vol. 12, no. 4, pp. 35-37, 2006.
[11] A. Haslindah, "Analisa pengendalian mutu minuman rumput laut dengan menggunakan metode fishbone chart pada PT. Jasuda di Kabupaten Takalar," ILTEK, vol. 7, no. 14, 2013.


